sinkholes in three areas of Murfreesboro where the USGS tracked flooding after storms in 2001–02.
USGS SIR 2005-5281a sinkhole opened in a Smyrna yard in late May 2026 and kept growing; the couple’s insurer and the city each said it was not theirs to fix (reported 16 June 2026; a news account, not an engineering finding).
WSMV News 4 · 16 June 2026 BWDA-0026we have not found a record of karst void-detection testing in any published project scope. If that record exists, send it to us and we will publish it.
Open question
The building isn’t the question.
What’s underneath it is.
A geothermal system means drilling hundreds of deep wells into limestone. That drilling — not the school — is what disturbs karst.
The surface looks solid right up until it isn't.
Karst is limestone dissolved into caves, channels and voids. A clay layer bridges them. Disturb the bridge and the ground above has nothing left to stand on.
Middle Tennessee sits on mapped karst.
What the public record already shows.
Tennessee’s karst is mapped, and it is extensive
The U.S. Geological Survey has documented the karst aquifers of Middle Tennessee — limestone carrying connected voids and conduits that let groundwater travel quickly, and far, out of sight.
USGS — Characteristics of Karst Aquifers in Tennessee (WRIR 97-4097)The state keeps well records, and they are public
Driller’s reports filed with the state describe what was found at depth across this county. They can be searched before anyone breaks ground. TDEC’s own description of the data says it “should not be used as an endpoint for decision making” and that “all well locations should be field verified by the user before decisions are made.”
TDEC water well data viewerThe state publishes construction rules for geothermal boreholes
Tennessee requires wells to be constructed, closed and reported under published rules. The chapter includes a separate standard for closed-loop geothermal boreholes (0400-45-09-.17).
Tenn. Comp. R. & Regs. 0400-45-09 (incl. .17, closed-loop geothermal boreholes) — Cornell LII text; official publisher is the Tennessee Secretary of StateDrawn from published federal and state sources. This page takes no position on any case, names no party, and makes no finding of fault.
108 schools on record. The same ground. The same question.
The 108 Tennessee schools where a ground-loop system is recorded or described in public sources (103 recorded or described; 5 more with ground-loop wells first recorded in 2025 or later), plus 8 that are proposed or planned, with the registered wells and mapped sinkholes within 4.5 miles of each. Drawn the same way, from the same public sources.
“We need new high schools, but we need to build them safely.”
Asking the Rutherford County Commission that any future public building include a complete survey of the ground it is built on — and that where the ground is karst, the tests come before the design.
Deryl Duer · Blackman resident · public comment, 2 min 6 sec
Three minutes is all it takes.
What we ask, before geothermal boreholes are drilled under a school site: that the ground be studied for karst, that the results be made public, and that a Tennessee-licensed geologist or geotechnical engineer with karst experience, independent of the project, review them.
Show up
The next Board of Education meeting with public comment (date and time on the Application to speak page, linked below). RCS Central Office, 2240 Southpark Drive. Request form by noon that day. Photo ID and proof of residency.
Ask the question
“Will a rigorous, karst-appropriate site investigation be completed before any geothermal drilling is approved?”
Send it on
An informed public is the best protection against a costly mistake made quietly.